Design Review Board

Thursday, July 10, 2025 at 09:00 AM

7 applications on the agenda

View source agenda on PrimeGov
Property #2
DRB25-1086
FKA DRB24

1015, 1801 ALTON ROAD

Approve Dev, 1801 Alton

Other (4) Survey Checklist Cover Sheet Mailing Labels Previous Order (2) Landscape LOI Narrative Plans
Property #3
DRB25-1089
1601 WEST 24 STREET

Approve Dev, 1601 W 24

Other (2) Survey (3) Checklist Cover Sheet Mailing Labels Landscape LOI Narrative Plans (2)
Property APPROVAL WITH CONDITIONS #4
DRB25-1080
6788 COLLINS AVENUE

The applicant is proposing exterior faΓ§ade modifications to an existing commercial shopping center composed of two single-story buildings. Specificall...

Other Survey Checklist Rendering Cover Sheet Staff Report Mailing Labels Previous Order LOI Plans
Property APPROVAL #5
DRB24-1077
6625 BREVITY LANE, 6626 SHEFFIELD LANE

The applicant is proposing to construct a new two-story residence on a through-lot located on La Gorce Island, with frontages on Brevity Lane and Shef...

Other (2) Survey Checklist Cover Sheet Staff Report Mailing Labels Previous Order LOI Narrative Plans
Property APPROVAL WITH CONDITIONS #6
DRB25-1095
6 & 7 FARREY LANE

Construction of a new three-story single-family residence on two lots connected by an air rights easement above a portion of the right-of-way adjacent...

Other Survey (2) Checklist Cover Sheet Staff Report Mailing Labels Landscape (2) LOI Narrative Plans
Property APPROVAL WITH CONDITIONS #7
DRB25-1096
FKA DRB16

0069 FKA File No. 22868, 850 COMMERCE STREET

The applicant is requesting Design Review Approval for the renovation of the front faΓ§ade, signage and the installation of a wood clad enclosure locat...

Other (4) Survey Checklist Cover Sheet Staff Report Mailing Labels Previous Order LOI Narrative Plans
Property APPROVAL WITH CONDITIONS #8
DRB25-1084
7729 CARLYLE AVENUE

Construction of a new 4-story multi-family building with six residential units to replace an existing single-family residence. The project includes gr...

Other (4) Survey Checklist Cover Sheet Staff Report Traffic Study (2) Mailing Labels Landscape (2) LOI Narrative Plans
Procedural Items (3)
1. After Action June 12, 2025
10. Parklet Design Guidelines
9. Sidewalk Color Discussion