Proposal

The applicant is requesting conditional use approval for a Neighborhood Impact Structure (NIS) consisting of a new 5-story mixed-use building exceeding 50,000 square feet. The project would replace an existing parking lot with a building containing 38,805 square feet of office space, 3,900 square feet of retail space, and eight townhomes facing Harding Avenue.

From the Letter of Intent

The applicant proposes to redevelop a 30,000 square foot property currently used as a parking lot with a new mixed-use development. The project will include eight townhomes, approximately 3,900 square feet of commercial space, and approximately 38,805 square feet of office space.

  • Redevelopment of existing parking lot property
  • Construction of eight townhomes
  • Construction of approximately 3,900 square feet of commercial space
  • Construction of approximately 38,805 square feet of office space
  • Renovation and ground floor addition to existing 7410 Collins building
  • Vehicle access exclusively from Collins Court alley
  • Loading and delivery access from Collins Court
  • Unified security system installation
  • Hurricane-proof impact windows
  • Stormwater retention systems
Staff Recommendation
APPROVAL WITH CONDITIONS

Conditions:

  • Deliveries and waste collections shall only occur between 9:00 AM and 5:00 PM each day
  • All loading operations shall take place within enclosed loading bays
  • No vehicle exceeding maximum size of loading spaces (10'x20') shall service the building
  • All trash rooms shall be air conditioned and sound-proofed
  • All trash containers shall utilize rubber wheels and noise-reducing surface paths
  • Special event permits shall be prohibited
  • No exterior bars or accessory outdoor bar counters permitted
  • Commercial uses on rooftop prohibited
  • Use of rooftop limited to office tenants and invited guests
  • Progress report required 90 days after obtaining business tax receipt
  • All required loading spaces must be provided on site unless variance granted
  • Additional 5 feet of depth required behind loading spaces
  • Stop signs required at garage intersections to avoid vehicular conflict
  • Compliance with Green Buildings requirements
  • Building permit must be obtained within 18 months

Compliance Findings:

✓ Concurrency: Satisfied ✗ Sea Level Rise: Addressed ✗ Comprehensive Plan: Consistent ✗ Land Development Regulations: Variance Required
Key Issues
  • Loading space variance required - only 2 of 3 required spaces provided on-site
  • Narrow garage configuration creates vehicular conflicts requiring stop signs
  • Trash room access blocked by parking space needs modification
  • Need for operational controls on deliveries, noise, and rooftop use
  • Insufficient depth behind loading spaces for actual loading operations