Property

Image extracted from submitted plans. See full documents in the attachments section below.

HPB25-0678

Jefferson Avenue (from 6th Street to 11th Street) and 13th Street (from Meridian Avenue to Washington Avenue)

Slow Streets 2.0

The following summaries were generated by AI from the official documents linked below. They may contain errors. Please refer to the original documents for authoritative information.

Proposal

An application for a Certificate of Appropriateness for street improvements associated with the introduction of protected bicycle lanes, including traffic calming devices, curb extensions, and vertical path dividers. This is part of the Slow Streets 2.0 program building upon the initial 2020 pilot program.

From the Letter of Intent

Implementation of the Slow Streets 2.0 project featuring the first ever parking-protected, two-way cycle-track in Miami Beach on Jefferson Avenue, along with vertical delineation/path dividers via K71 bollards and painted curb extensions on both Jefferson Avenue and 13 Street.

  • Installation of K71 bollards for vertical delineation/path dividers
  • Painted curb extensions using StreetBond SB150 paint in 'Rose Dust' color
  • Implementation of parking-protected, two-way cycle-track on Jefferson Avenue
Staff Recommendation
APPROVAL WITH CONDITIONS

Compliance Findings:

✓ Sea Level Rise: Satisfied ✓ Certificate Of Appropriateness: Satisfied
Key Issues
  • Enhanced aesthetic design using durable, contemporary traffic control features
  • Installation of vertical path delineators and painted curb extensions
  • Two-way cycle track implementation
  • Traffic calming measures including rubberized speed cushions
Property Details
Historic District Flamingo Park Local Historic District
Applicant City of Miami Beach
Architect Alta & Street Plans
Meeting

Tuesday, December 16, 2025

View Full Agenda