Property

Image extracted from submitted plans. See full documents in the attachments section below.

DRB25-1135

600 Alton Road Right of Way

The following summaries were generated by AI from the official documents linked below. They may contain errors. Please refer to the original documents for authoritative information.

Proposal

Crown Castle is proposing to install nine small wireless facility nodes within the City's public rights-of-way at various locations outside of historic districts. The poles conceal cellular components and include integrated street lights within stand-alone utility poles.

From the Letter of Intent

Installation of a small wireless facilities network consisting of underground fiber optic cable and telecommunications nodes on utility poles within the right of way. The nodes will function as both street light poles and telecommunications poles, designed as stealth installations to meet aesthetic concerns in historic districts.

  • Installation of underground fiber optic cable
  • Installation of small wireless facility nodes on utility poles
  • Installation of stealth nodes functioning as street light poles and telecommunications poles
  • Installation on existing FPL utility poles where no viable streetlight pole exists
  • Installation of electric meter pedestals near utility poles
Staff Recommendation
APPROVAL WITH CONDITIONS

Compliance Findings:

✓ Sea Level Rise: Satisfied ✗ Design Review Criteria: Not Satisfied
Key Issues
  • Pedestrian flow and clear pedestrian paths
  • Visual impact on residential structures and view corridors
  • Alignment with existing utility poles
  • Stealth design and aesthetic integration
  • Pole color matching existing light poles
Project Details
Style Stealth design utility poles
Height Up to 40 feet maximum for wireless communications facilities
Applicant Crown Castle Fiber LLC
Architect TEP OPCO, LLC
Meeting

Thursday, December 11, 2025

09:00 AM

View Full Agenda