DRB25-1134

887 2nd Street Right of Way

The following summaries were generated by AI from the official documents linked below. They may contain errors. Please refer to the original documents for authoritative information.

Proposal

The applicant is proposing to install nine small wireless facility nodes within the public right-of-way at various locations throughout the city. The poles conceal cellular components and include integrated street lights within stand-alone utility poles, with some antennas mounted on existing poles requiring nearby power meters.

From the Letter of Intent

Installation of a small wireless facilities network consisting of fiber optic cable (underground) and nodes (utility poles containing telecommunications equipment) within the right of way. The project includes stealth nodes that function as both street light poles and telecommunications poles.

  • Install underground fiber optic cable
  • Install small wireless facility nodes on utility poles
  • Install stealth nodes functioning as street light and telecommunications poles
  • Install small wireless facilities on existing FPL utility poles where no viable streetlight pole exists
  • Install electric meter pedestals within proximity of existing utility poles
Staff Recommendation
APPROVAL WITH CONDITIONS

Compliance Findings:

✓ Sea Level Rise: Satisfied ✗ Design Review Criteria: Not Satisfied
Key Issues
  • Pedestrian flow and clear pedestrian paths
  • Visual impact and aesthetic appropriateness
  • Pole placement and alignment with existing utilities
  • Impact on residential views
  • Sidewalk width constraints
  • Stealth design requirements
Project Details
Style Stealth design to minimize visual impact
Height Maximum 40 feet or existing light pole height, whichever is greater
Applicant Crown Castle Fiber LLC
Architect TEP OPCO, LLC
Meeting

Thursday, December 11, 2025

09:00 AM

View Full Agenda