Property

Image extracted from submitted plans. See full documents in the attachments section below.

DRB25-1100

28 VENETIAN WAY RIGHT

OF-WAY

The following summaries were generated by AI from the official documents linked below. They may contain errors. Please refer to the original documents for authoritative information.

From the Letter of Intent

Rehabilitation and hardening of the Belle Isle water booster station (W-5) to increase system resilience and reliability during emergencies. The project includes upgrading mechanical, structural, and electrical equipment along with facility hardening measures.

  • Rehabilitating mechanical, structural, and electrical equipment
  • Upgrading instrumentation and controls
  • Improving ventilation and air conditioning systems
  • Performing overall facility hardening
  • Raising above ground vents and ductwork above design flood elevation on north side of Venetian Way
  • Installing landscaping of sufficient height around booster station
  • Installing new emergency generator and fuel tank at electrical building on south side of Venetian Way
Project Details
Applicant City of Miami Beach Department of Public Works
Architect Hazen and Sawyer and CES Consultants
Meeting

Thursday, December 11, 2025

09:00 AM

View Full Agenda